This is a friendly reminder that all the materials and supplies staged\stored on the 300 and 400 blocks of N Washington in connection with the streetscape project should not be moved or displaced by anyone without prior consent from the General Contractor, Casey Slone. All the supplies\materials are the responsibility of the General Contractor until they are installed and accepted by the City and therefore must not be impacted by anyone. If for some reason you have had the need to displace\relocate any of the materials please replace any and all to their original position. Thank you. Eric G. Powell, PE Director of Public Works & Utilities City Engineer 903-935-4489 City of Marshall PO Box 698 Marshall, TX 75671 This message (including any attachments) is intended only for the use of the individual or entity to which it is addressed and may contain information that is non-public, proprietary, privileged, confidential, and exempt from disclosure under applicable law or may constitute as attorney work product. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, notify us immediately by telephone and (i) destroy this message if a facsimile or (ii) delete this message immediately if this is an electronic communication. Thank you.